Appendix A: Housing Safety & Compliance KPIs

 

Table 1:  Progress in electrical safety compliance

Feb 24

April 24

June 24

July 24

Aug 24

Sept 24

Oct 24

Nov 24

Dec 24

Jan 25

Feb 25

Mar 25

Direction of travel

Expected date of Compliance

5 Year EICR domestic testing (% of homes)*

42.9%

49.1%

53.0%

55.8%

57.4%

60.1%

63.2%

(7,679)

66.4%

67.9%

70.7%

72.6%

75.5%

Green

December 2026

10 Year EICR domestic testing (% of homes)*

66.6%

70.1%

72.0%

73.7%

74.9%

76.4%

78.1%

(9,383)

80%

80.9%

82.9%

84.6%

86.7%

Green

Communal EICRs (% of communal areas)

5.3%

14.0%

20.8%

22.0%

29.4%

33%

37.6%

39.3%

43.9%

45.1%

45.4%

48.5%

Green

December 2026

*No outstanding C1 (immediate danger) and C2 (potentially dangerous) actions.  We don’t record C1s and C2s as part of a separate inspection programme because as we inspect, we fix (remediate) C1s and C2s. 

 


 

Table 2:  Progress in fire safety compliance

Feb 24

April 24

June 24

July 24

Aug 24

Sept 24

Oct 24

Nov 24

Dec 24

Jan 25

Feb 25

Mar 25

Direction of travel

Expected date of Compliance

FRAs in High Rise buildings (% of buildings)

100%

100%

100%

100%

100% 

100% 

100%

100%

100%

71.7%

(previously reported 63%)

60.9%

30.4%

Red

Sept 2025*

FRAs in Medium Rise buildings: (% of buildings)

99.8%

100%

100%

100%

100% 

100% 

100%

100%

100%

100%

100%

100%

Green

Compliant

FRAs Low Rise buildings: (% of buildings)

20.9%

57.0%

78.22%

92.9% 

93.5%

99.1%

99.4%

99.8%

99.8%

99.8%

Green

December 24

FRA remediation actions (snapshot number of live actions)

1,748

4,253

6,472

8,228

8,142

8,114

8,268

7,554

7,287

(incl.  1108 Best Practice)

6420

Red

December 26**

*We completed a large number of FRAs in a compressed period last year, and are now deliberately staggering them from January to September to manage both assessments and resulting actions more effectively.

** High number of total actions remains a concern, however  progress against  addressing these has continued.

Table 3:  Progress in water safety compliance

Feb 24

April 24

June 24

July 24

Aug 24

Sept 24

Oct 24

Nov 24

Dec 24

Jan 25

Feb 25

Mar 25

Direction of travel

Expected date of Compliance

Legionella Risk Assessments (% of water systems covered)*

79.0%

 77.5%

77.5%

78.1%

Red

July 2025***

Water Risk Assessments (% of buildings covered (of 12,672)

52.1% (6,601)

57.1% (7,240)

60.7% (7693)

61.9% (7,844)

63.4% (8,030)

Red

December 2025

 

*We continue to face challenges in providing this KPI.  We have moved away from "system" reporting in favour of by building. That's more in line with how we manage the service i.e one risk assessment per building and simpler to track.


 

Table 4: Progress in other areas of compliance raised by RSH

Feb 24

April 24

June 24

July 24

Aug 24

Sept 24

Oct 24

Nov 24

Dec 24

Jan 25

Feb 25

Mar 25

Direction of travel

Expected date of Compliance

Smoke alarms/detectors (% of homes)

50.8%

77.0%

81.5%

83.6%

86.5%

89.4%

92.9%

94%

95.7%

96.3%

97.5%

97.7%

Green

Oct 2025*

Repairs jobs open for more than 28 days (HRA)

-

-

9,653

(incl. TA &EA)

7,250

(incl. TA & EA)

 7,923

(incl. TA &EA)

6599

6222

6578

6,950

5,357

4,399

4,134

Green

July 2025

*100% Compliance is dependent on access.  260  properties remaining with no recorded smoke detection and we have started the informal part of the no access process by writing to these tenants and cold calling. Dedicated resource attending all remaining properties and installing battery smoke detection (or testing and recording existing smoke detection) which will be in place until the property is tested as part of our programme, at which point hard wired smoke detection will be installed. 

 


 

Table 5: other areas of Safety & Quality compliance (currently compliant)

April

May

June

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

March

Carbon Monoxide Detection / Alarms

 

Total detection in domestic dwellings

97.79%

91.4%

96.6%

97.4%

97.3%

97.9%

98.3%

98.6%

98.8%

Gas/Fuel Safety

 

Communal Boilers certification in date - annual

100%

100%

100%

 

100%

100%

100%

100%

100%

100%

100%

100%

Domestic dwellings certification in date – annual

100%

99.97%

100%

 

100%

100%

100%

100%

100%

100%

100&

100%

Properties with a capped gas supply - reduction in numbers*

77

23

40

 

32

32

23

24

24

16

28

19

Asbestos Safety

 

Common ways – Total rolling compliance

98.53%

98.90%

99.4%

99.8%

90.1%

99.6%

97.0%

98.4%

99.8%

100%

100%

100%

Asbestos Re-inspection programme – Common ways
Rate of progress

 

 

 

 

 

17.06%

56.70%

83.7%

94.9%

97.9%

100%

100%

Lift Safety (lifts & lifting equipment)

 

Communal (Passenger) lifts (LOLER) servicing

100.00%

100.00%

100.0%

100.0%

100.0%

100.0%

100.0%

100%

100%

99.2%

100%

100%

Domestic lift and stair lift, equipment servicing

100.00%

100.00%

100.0%

100.0%

100.0%

100.0%

100.0%

100%

100%

100%

100%

100%

 

*Most capped gas supplied are tenant-driven, with some void properties capped for safety. Housing Customer Services are  conducting welfare checks where tenants have asked for capped gas, working with them to resolve any debt or other issues arising.